Corporate

Search Results for: Как поцеловать своего парня в первый раз больше в insta---batmanapollo

Bibby Sapphire

Conversion of Offshore Construction Vessel to 15 man, 300m Saturation Diving Support Vessel for Bibby Line Ltd. Fabrication, installation and integration of two moon pools through existing vessel and conversion of existing moon pool to gas store area. Fabrication, installation and integration of… Continue reading

New generation jack-up vessel arrives in the UK for first job at Gwynt y Môr Offshore Wind Farm

news item

A NEW offshore wind farm installation vessel, the first of its kind in the UK, arrived at Cammell Laird Shipyard in Birkenhead on Saturday (1 September) in preparation for its first operational activity at Gwynt y Môr Offshore Wind Farm. The new generation jack-up vessel, named Friedrich… Continue reading

Cammell Laird completes first year of second RFA cluster term

news item

Cammell Laird has completed the first year of the second five-year period of its cluster contract with the Royal Fleet Auxiliary (RFA). Cammell Laird CEO John Syvret CBE said the first anniversary marked ‘a period of significant progress’ and added that the company would now be redoubling its… Continue reading

Cammell Laird completes major conversion contract for Nexans

news item

Birkenhead based shipyard, Cammell Laird Shiprepairers and Shipbuilders Ltd, has completed major contract to lengthen the Skagerrak, a cable laying ship for Nexans, the worldwide leader in the cable industry. Cammell Laird Managing Director Linton Roberts said the yard had ‘pulled out all the… Continue reading

Excalibur

Crane barge lengthening and upgrade to offshore wind turbine installation vessel. Lengthening the existing jack up construction rig by a 22m x 32m bow section. Provision of new ballast, freshwater and electrical systems. Relocating the existing accommodation block to the new section and major… Continue reading